Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | bowesrailwaypath, graffiti, poor, ramp, sign, surface |
Date time: | 3.51pm, Thursday 27th August, 2015 |
Time line: | Earlier | Later |
Facing: | South west |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Blaydon |
The Bowes Railway Path is in a very poor condition. The ramp to Newcastle Bank has a step at the end where it hasn't been tied into the main path properly.
Comments reflect the views of the original submitter only.