Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | aiud, romania |
Date time: | 4.47pm, Saturday 8th April, 2023 |
Time line: | Earlier | Later |
Facing: | North west |
Added by: | timbo |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | timbo |
South end of bridge no.3, Aiud - there's a dropped kerb at the zebra crossing, or a bit of a ramp in line with the bridge. Neither ideal.
Comments reflect the views of the original submitter only.