Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | blocked, bollard, busstop, cambridge, cycleway, drain, flood, hillsroad, lookleft, puddling, tactile |
Date time: | 5.46pm, Monday 6th June, 2022 |
Time line: | Earlier | Later |
Facing: | Bearing of 330° |
Added by: | simon |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Cambridge |
Flooded - due to blocked drain on the cycleway at this bus stop bypass.
Comments reflect the views of the original submitter only.