Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | covid-19 |
Date time: | 10.29am, Monday 21st March, 2022 |
Time line: | Earlier | Later |
Facing: | Unknown |
Added by: | widenmypath |
Copyright: | Public domain |
Area: | Blaydon |
Install a cycleway between Rowlands Gill and High Spen along B6315 to improve cycle safety and encourage more local people to travel by bike.
Comments reflect the views of the original submitter only.