Add to Gallery: | Add this photo to a Gallery |
Category: | General road environment: A problem that needs to be fixed |
Tags: | barrierstocycling, ncn55, trafford |
Date time: | 2.09pm, Monday 15th February, 2021 |
Time line: | Earlier | Later |
Facing: | North west |
Added by: | riccardo |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Salford |
Stretford Town Hall Trafford . Cycle lane lines and green are being repainted. They are being painted exactly the same sub standard width . Should be 2 metres minimum especially on this national cycle route 55 and as there is plenty of space. Not certain why the surface should be green here - it's not passing an entrance or even a dropped kerb
Comments reflect the views of the original submitter only.