Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: An example of good practice |
Tags: | None |
Date time: | 7.34am, Sunday 27th September, 2020 |
Time line: | Earlier | Later |
Facing: | Unknown |
Added by: | garydawes |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Blaydon |
The start of the path from Leam Lane to Springwell. Don't get excited, the tarmac doesn't last long!
Comments reflect the views of the original submitter only.