Add to Gallery: | Add this photo to a Gallery |
Category: | A sign, usually on the cycleway network, indicating a route for cycling.: A problem that needs to be fixed |
Tags: | community, complex, huntington, leisure, missing, signage, stadium, york |
Date time: | 1.12pm, Tuesday 22nd December, 2020 |
Time line: | Earlier | Later |
Facing: | North west |
Added by: | rebba |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | Rebba |
Area: | Haxby |
Totem at York Stadium site www.york.gov.uk/CommunityStadium. The leisure complex includes a pool, climbing facility, public toilets and other facilities www.better.org.uk/york-stadium-leisure-complex. The leisure centre opened in the third week of December 2020. On my visit - 22.12.20 - there were no signs telling people on foot, on cycles or in wheelchairs what was onsite, how to get to the attractions or how to move through the site to get to Monks Cross retail centre. I happened across it by accident.
Comments reflect the views of the original submitter only.