Add to Gallery: | Add this photo to a Gallery |
Category: | General road environment: A problem that needs to be fixed |
Tags: | bus, cambridge, overhang |
Date time: | 9.34am, Monday 13th January, 2020 |
Time line: | Earlier | Later |
Facing: | Bearing of 25° |
Added by: | simon |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Cambridge |
Design fail: While buses wait for the rising bollard to drop, the backend of the bus partially blocks the carriageway.
Comments reflect the views of the original submitter only.